Upgrade to 11.1 with working Virtual WAN deployment 编辑

March 12, 2021 Contributed by:  SC
  1. In the Change Management > Change Preparation page, click Choose Files and select the ctx-sdw-sw-11.1.0.x.zip software package file. Click Upload.

    Note:

    You can download the Citrix SD-WAN release 11.1 software package from the Downloads
    page.

    localized image

    A progress bar appears to show the current upload progress.

    localized image

  2. After the upload process is successful, relevant appliance models are displayed. The appliances would be upgraded based on the configuration file.

    localized image

  3. Click Stage Appliance to proceed with validation of configuration file. The License agreement page for user acceptance appears. Click I accept the End User License Agreement and click OK.

    localized image

  4. The Appliance Staging process is initiated. The changes are distributed to all appliances on the network. The transfer progress bar appears and the site details table is updated.

    localized image

  5. Once the transfer progress is 100% complete, click Next to proceed to activation.

    localized image

    The various states of software package configuration displayed in the summary table indicate the following:

    • Preparing - Local processing to prepare update package for transfer to the appliance.
    • Preparing Region Packages - Local processing to prepare update package for transfer to RCN. (Applicable if RCN is part of network).
    • Percentage - Percent of package transferred to the appliance.
    • Unpacking - Remote appliance processing to apply the update package.
    • Transferring Region - Package are being transferred to RCN. (Applicable if RCN is part of network).
    • Failed - Remote detected incomplete transfer.
    • Canceled - Canceled by user when ‘Ignore Incomplete’ was checked during Stage Appliances
    • Not Needed - Prepared staged package does not include this site-appliance name.
    • Not Connected - Local cannot see the remote’s active package information.
  6. Click Activate Staged to activate the staged software.

    localized image

  7. After the countdown, a message indicates that activation is completed. Click Done.

    localized image

  8. Navigate to Change Management page to view the transfer status.

    localized image

The Multi-region summary table provides the following details:

  • Region – Name of the region
  • Total Site - Total number of sites in the region.
  • Not Connected - Total number of sites not connected in the region.
  • Connected - Total number of sites connected in the region.
  • Traffic Impacted - Total number of sites where the traffic is impacted in the region.
  • No Traffic Impact - Total number of sites where the traffic is not impacted in the region.
  • Staging In Progress - Total number of sites for which local processing is attempting to prepare update package for transfer in the region.
  • Staging Completed- Total number of sites for which staging has completed in the region.
  • Staging Failed - Total number of sites for which incomplete transfer was deleted in the region.

localized image

Click the Global Multi-Region Summary table entry link to filter the region specific configuration reports.

Localized image

For muliregion deployment, on each RCN navigate to Change Management Settings page and schedule the installation of dependent components. By default the MCN/RCN assigns schedules installation to be attempted every day at 21:20:00 based on software availability on the branches.For more information, see Change Management Settings

如果你对这篇内容有疑问,欢迎到本站社区发帖提问 参与讨论,获取更多帮助,或者扫码二维码加入 Web 技术交流群。

扫码二维码加入Web技术交流群

发布评论

需要 登录 才能够评论, 你可以免费 注册 一个本站的账号。
列表为空,暂无数据

词条统计

浏览:98 次

字数:6018

最后编辑:7 年前

编辑次数:0 次

    我们使用 Cookies 和其他技术来定制您的体验包括您的登录状态等。通过阅读我们的 隐私政策 了解更多相关信息。 单击 接受 或继续使用网站,即表示您同意使用 Cookies 和您的相关数据。
    原文