I am trying to create a script to optimize production using linear programming.
There are 2 lines that have overlapping products:
Line 1 can produce: a,b,c in a volume of 10 tons per day.
Line 2 can produce: a,b,d in the amount of 8 tons per day.
Usually each line works 24 hours a day.
Switching the line between the type of product produced takes 2 hours. Accordingly, if the last day 1 line produced a product, and today the solver believes that it is necessary to produce 10 hours of product a and the rest of the time to produce a new product b, then the time limit for the day will be 22 hours.
It is desirable to switch the line no more than once every 3 days.
The input we get is the data:
- the required volume of each product each day to sell
Example: day 1 requires 5 tons of product a, 6 tons of product d, day 2 requires 8 tons of product c, 2 tons of product a. - The initial stock balance at the beginning of day 1 is 3 tons of product a, 2 tons of product b, and 3 tons of product c.
It is necessary to get data on the output of which line at what time what product is produced each day during the month in order to maximize the production of the product and take into account the requirements for shipments for sale.
I can not understand how to take into account the possible switching of the line between products and the time cost of 2 hours for this switching.
如果你对这篇内容有疑问,欢迎到本站社区发帖提问 参与讨论,获取更多帮助,或者扫码二维码加入 Web 技术交流群。

绑定邮箱获取回复消息
由于您还没有绑定你的真实邮箱,如果其他用户或者作者回复了您的评论,将不能在第一时间通知您!
发布评论
评论(1)
取决于模型的细节(例如离散时间与连续时间等)。没有更多详细信息,这将无法回答。如何建模转换是众所周知的,但是解释这需要一些文本,数学和图形,并不真正适合这个论坛。您可能需要进行文献搜索,以查看其他人在这一领域所做的事情。请注意,没有现有的已发布模型会准确地做您想要的事情,但它应该给您一些想法。
Depends on the details of the model (e.g. discrete-time vs continuous-time etc). This cannot be answered without much more detailed information. How to model changeovers is well known, but explaining this requires quite some text and math and graphics, not really suited for this forum. You may want to do a literature search to see what others have done in this area. Note that no existing published model will exactly do what you want, but it should give you some ideas.