如果我们通过SavePoint取消工作,Job被取消了,SavePoint是失败如何现在还原这项工作

发布于 2025-01-28 12:10:56 字数 451 浏览 1 评论 0原文

我已经使用本机Kubernetes部署并与SavePoint一起在应用程序模式下部署了Flink作业(我正在使用REST API命令),但是如果它未能完成保存点,则可以为该工作取消,因为它已经被取消了?

1) success:

{
  "status":{"id":"COMPLETED"},
  "operation":{
    "location":"file:/savepoints-dir/savepoint-ad4025-dd46c1bd1c80"
  }
}
2) failure:

{
  "status":{"id":"COMPLETED"},
  "operation":{
    "failure-cause":{
      "class": "java.util.concurrent.CompletionException",
      "stack-trace": "..."
    }
  }
}

I have deployed flink job in application mode using native kubernetes deployment and stopping job along with savepoint (I'm using rest api command for that) but if it fails to complete savepoint is it possible to take savepoint for that job as it was cancelled already?

1) success:

{
  "status":{"id":"COMPLETED"},
  "operation":{
    "location":"file:/savepoints-dir/savepoint-ad4025-dd46c1bd1c80"
  }
}
2) failure:

{
  "status":{"id":"COMPLETED"},
  "operation":{
    "failure-cause":{
      "class": "java.util.concurrent.CompletionException",
      "stack-trace": "..."
    }
  }
}

如果你对这篇内容有疑问,欢迎到本站社区发帖提问 参与讨论,获取更多帮助,或者扫码二维码加入 Web 技术交流群。

扫码二维码加入Web技术交流群

发布评论

需要 登录 才能够评论, 你可以免费 注册 一个本站的账号。
我们使用 Cookies 和其他技术来定制您的体验包括您的登录状态等。通过阅读我们的 隐私政策 了解更多相关信息。 单击 接受 或继续使用网站,即表示您同意使用 Cookies 和您的相关数据。
原文