Drupal site--quick theme,这可能吗?
抱歉,如果这是一个新手问题,但只需要知道这是否“可能”...我的问题是:
我们当前有一个 drupal 站点,即 http://dpc.printing.org/,您看到的模板是从头开始定制设计的。请注意,需要会员登录才能访问与我们的数据库相关的付费会员内容。
我的问题是:是否可以从上面的 #1 中废弃模板并使用此模板来代替 http://www.themesnap.com/theme-demos/gomobile/ 并将代码添加到会员访问数据库所需的模板中?
如果是,大约需要多少工作量(以小时计)才能完成此任务?
非常感谢!
Sorry if this is a novice question, but just need to know if this is "possible"...My question is:
We have a current drupal site that is http://dpc.printing.org/ where the template you see was custom designed from scratch. Note that there is member log in to access paying member content that is ties into our database.
My question is: Is it possible to scrap the template from #1 above and use this template instead http://www.themesnap.com/theme-demos/gomobile/ and just add the code to the template required for member access to out database?
If yes, how much work (in terms of hours) would it take to accomplish this, roughly?
Thank you very much!
如果你对这篇内容有疑问,欢迎到本站社区发帖提问 参与讨论,获取更多帮助,或者扫码二维码加入 Web 技术交流群。
绑定邮箱获取回复消息
由于您还没有绑定你的真实邮箱,如果其他用户或者作者回复了您的评论,将不能在第一时间通知您!
发布评论
评论(1)
该主题指出它与现有的 Drupal 站点不兼容。
如果您对该主题感兴趣的功能包括幻灯片、新闻提要等,那么该功能很可能需要在您现有的 Drupal 安装中复制(创建内容类型、创建视图、放置块)等),谁知道主题中的 CSS 是否与您创建的配置完全匹配。
使用外部数据库信息的自定义登录是否正确实现(使用自定义模块)或不正确(使用注入主题模板的代码)将决定使用 Go Mobile 的安装配置文件并移动自定义代码是否是一个合理的解决方案。
基本上,如果我将其估计为客户端项目,而无法看到现有网站的后端或 Go Mobile 主题的详细信息,那么我会将其视为从头开始构建网站和主题,这对于经验丰富的 Drupalista 来说,需要 60 到 80 个小时。
That theme states that it is not compatible for use with existing Drupal sites.
If the features you are interested in with that theme include things like the slideshow, the news feeds, etc. that functionality will most likely need to be duplicated within your existing Drupal installation (creating content types, creating views, placing blocks, etc.) and who knows whether the CSS in the theme will match up exactly with the configurations you create or not.
Whether the custom login using external database information was implemented correctly (using a custom module) or incorrectly (using code injected into theme templates) would decide whether using Go Mobile's install profile and moving over the custom code would be a reasonable solution.
Basically, if I were estimating this out as a client project without being able to see the back-end of the existing site or the details of the Go Mobile theme, I would treat it the same as building a site and theme from scratch, which would be 60 to 80 hours for an experienced Drupalista.