2365. Task Scheduler II

中文文档

Description

You are given a 0-indexed array of positive integers tasks, representing tasks that need to be completed in order, where tasks[i] represents the type of the ith task.

You are also given a positive integer space, which represents the minimum number of days that must pass after the completion of a task before another task of the same type can be performed.

Each day, until all tasks have been completed, you must either:

  • Complete the next task from tasks, or
  • Take a break.

Return_ the minimum number of days needed to complete all tasks_.

 

Example 1:

Input: tasks = [1,2,1,2,3,1], space = 3
Output: 9
Explanation:
One way to complete all tasks in 9 days is as follows:
Day 1: Complete the 0th task.
Day 2: Complete the 1st task.
Day 3: Take a break.
Day 4: Take a break.
Day 5: Complete the 2nd task.
Day 6: Complete the 3rd task.
Day 7: Take a break.
Day 8: Complete the 4th task.
Day 9: Complete the 5th task.
It can be shown that the tasks cannot be completed in less than 9 days.

Example 2:

Input: tasks = [5,8,8,5], space = 2
Output: 6
Explanation:
One way to complete all tasks in 6 days is as follows:
Day 1: Complete the 0th task.
Day 2: Complete the 1st task.
Day 3: Take a break.
Day 4: Take a break.
Day 5: Complete the 2nd task.
Day 6: Complete the 3rd task.
It can be shown that the tasks cannot be completed in less than 6 days.

 

Constraints:

  • 1 <= tasks.length <= 105
  • 1 <= tasks[i] <= 109
  • 1 <= space <= tasks.length

Solutions

Solution 1: Hash Table + Simulation

We can use a hash table $day$ to record the next time each task can be executed. Initially, all values in $day$ are $0$. We use a variable $ans$ to record the current time.

We iterate through the array $tasks$. For each task $task$, we increment the current time $ans$ by one, indicating that one day has passed since the last task execution. If $day[task] > ans$ at this time, it means that task $task$ can only be executed on the $day[task]$ day. Therefore, we update the current time $ans = \max(ans, day[task])$. Then we update the value of $day[task]$ to $ans + space + 1$, indicating that the next time task $task$ can be executed is at $ans + space + 1$.

After the iteration, we return $ans$.

The time complexity is $O(n)$ and the space complexity is $O(n)$, where $n$ is the length of the array $tasks$.

class Solution:
  def taskSchedulerII(self, tasks: List[int], space: int) -> int:
    day = defaultdict(int)
    ans = 0
    for task in tasks:
      ans += 1
      ans = max(ans, day[task])
      day[task] = ans + space + 1
    return ans
class Solution {
  public long taskSchedulerII(int[] tasks, int space) {
    Map<Integer, Long> day = new HashMap<>();
    long ans = 0;
    for (int task : tasks) {
      ++ans;
      ans = Math.max(ans, day.getOrDefault(task, 0L));
      day.put(task, ans + space + 1);
    }
    return ans;
  }
}
class Solution {
public:
  long long taskSchedulerII(vector<int>& tasks, int space) {
    unordered_map<int, long long> day;
    long long ans = 0;
    for (int& task : tasks) {
      ++ans;
      ans = max(ans, day[task]);
      day[task] = ans + space + 1;
    }
    return ans;
  }
};
func taskSchedulerII(tasks []int, space int) (ans int64) {
  day := map[int]int64{}
  for _, task := range tasks {
    ans++
    if ans < day[task] {
      ans = day[task]
    }
    day[task] = ans + int64(space) + 1
  }
  return
}
function taskSchedulerII(tasks: number[], space: number): number {
  const day = new Map<number, number>();
  let ans = 0;
  for (const task of tasks) {
    ++ans;
    ans = Math.max(ans, day.get(task) ?? 0);
    day.set(task, ans + space + 1);
  }
  return ans;
}

如果你对这篇内容有疑问,欢迎到本站社区发帖提问 参与讨论,获取更多帮助,或者扫码二维码加入 Web 技术交流群。

扫码二维码加入Web技术交流群

发布评论

需要 登录 才能够评论, 你可以免费 注册 一个本站的账号。
列表为空,暂无数据
    我们使用 Cookies 和其他技术来定制您的体验包括您的登录状态等。通过阅读我们的 隐私政策 了解更多相关信息。 单击 接受 或继续使用网站,即表示您同意使用 Cookies 和您的相关数据。
    原文